Page 44 ecom-J2KN
pro
Press „Start measurement“ / <OK> prior to going thru the following
steps to start the measurement:
- release tubing of the flow probe
- wait for zeroing of pressure sensor
- re-connect tubing of the flow probe
- position flow probe into exhaust gas pipe
(observe mark for flow direction)
- switch off burner and simultaneously press <F1>
or:
- press <F2> to activate timer (5 sec.) and switch off burner by beep
- after approx. 30 sec. the measurement value converted in negative
points is available
An overview of the measurements is available under „Results“.
Press <Print> to print them out.