EasyManua.ls Logo

EDMI ES-12B - Page 19

EDMI ES-12B
25 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ES-12B 5 Terminal Single Phase Residential Electricity
Meter - Installation and Commissioning Guide
Copyright © 2020 EDMI Europe Ltd. All rights reserved
Version / Status: 1.0
Public
PAGE 19 OF 25
Message
Description
The ES-12B has finished pairing and is waiting to receive its first
GBCS message.
The first message has been received and the meter is processing
DUIS service request 8.1.1.
The response message has been sent, the response of which is
indicated by a P (pass) or F (fail). This result is stored in the
commissioning log.
The second message has been received and the meter is
processing DUI service request 6.20.
The response message has been sent, the response of which is
indicated by a P (pass) or F (fail). This result is stored in the
commissioning log.
The third message has been received and the meter is processing
DUI service request 6.21.
The response message has been sent, the response of which is
indicated by a P (pass) or F (fail). This result is stored in the
commissioning log.
The fourth message has been received and the meter is processing
DUI service request 1.1.
C
O
M
I
S
W
A
I
T
I
N
G
C
O
M
I
S
1
8.
1.
1
C
O
M
I
S
1
F
8.
1.
1
C
O
M
I
S
1
P
8.
1.
1
C
O
M
I
S
2
6.
2
0
C
O
M
I
S
2
F
6.
2.
0
C
O
M
I
S
2
P
6.
2.
0
C
O
M
I
S
3
6.
2
1
C
O
M
I
S
3
F
6.
2.
0
C
O
M
I
S
3
P
6.
2.
0
C
O
M
I
S
4
1.
1

Related product manuals