EasyManua.ls Logo

Edwards iF1800

Edwards iF1800
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A533-23-880 Issue C
Page 32 © Edwards Limited 2009. All rights reserved.
Edwards and the Edwards logo are trademarks of Edwards Limited.
INSTALLATION
Table 11 - Installation checklist
Installation operation Section
Unpack and inspect 3.3
Remove the enclosure panels 3.4
Reconfigure the nitrogen and water connections (if required) 3.5
Locate the iF system 3.6
Check the pump oil-level(s) 3.7
iF1800 systems 3.7.2
Install or replace the Pump Display Terminal and optional accessories(if necessary) 3.8
Install the Pump Display Terminal 3.8.1
Install optional accessories 3.8.2
Connect the iF inlet to your vacuum system 3.9
Connect the iF exhaust outlet to your exhaust extraction system 3.10
Connect to your factory extraction system (optional) 3.11
Connect the nitrogen supply 3.12
Leak test the system 3.13
Install additional safety equipment (optional) 3.14
Connect to your emergency stop circuit (optional) 3.15
Electrical supply and RF earth (ground) connections 3.16
Reconfigure the iF system for your electrical supply (if necessary) 3.16.1
Reconfigure the pump(s) for your electrical supply (if necessary) 3.16.2
Connect the electrical supply to the iF system 3.16.3
Connect an additional RF earth (optional) 3.16.4
Refit the enclosure panels 3.17
Connect the cooling-water pipelines 3.18
Adjust the interstage purge flow rates if necessary 3.19
Commission the iF system 3.20
Switch on an iF1800 system 3.20.1

Table of Contents

Related product manuals