2.02.0
2.02.0
2.0
Hardware InstallationHardware Installation
Hardware InstallationHardware Installation
Hardware Installation
2.1 Important Information and Initial Checkout:
2.2 Review the "EDC Wiring Work Sheets:"
2.3 Verify You Have all the Probes, Modules, Transducers and Cables:
2.4 Install the MVP Display:
2.5 Install the Temperature Probes:
2.6 Install the Pressure Transducers:
2.7 Install the Interface Circuit for Annunciators:
2.8 Install the Interface Circuit for a PWM Backlight System (Optional):
2.9 Install the Interface Circuit for Flap and Trim Pots (OEM / Experimental):
2.10 Install the Interface Circuit for the Gear Position, Unsafe Indicator and Gear
Warning:
2.11 Install the CO Detector, G-Sensor and/or Other Available MVP Options:
2.12 Install the Shunt:
2.13 Install the Fuel Flow Transducer:
2.14 Install the EI P-300C Fuel Level Probes (OEM or Experimental Only):
2.15 Install the EI P-300M Fuel Level Sender:
2.16 Install the Resistive Fuel Level Module (RFLM-4-X):
2.17 Install the Voice Alarm Control Panel (OEM or Experimental Only):
2.18 Install the Intensity Control Pot (Optional):
2.19 Install the Master Warning (red) and Caution (yellow) Lights:
2.10 Install the USB-6A (Optional):
2.21 Install the FM-SC or AC-1 Converter (Optional):
2.21 Install any Additional Modules (Optional):
2.23 Installing the EDC-33P:
9