Emaldo Power Core User Manual
safety isolation requirements.
3.5 Check the outer packaging
Before opening the energy storage outer packaging, please check the outer packaging for any
Spacing between top, left, and right
Interval between front and
back
Note:
The battery expansion
cabinet is optional. The
standard length of the
parallel line (along with the
expansion cabinet) between
cabinets is 1m.