Emaldo Power Core User Manual
3.11 Installation of Additional Cabinet
Danger
Before drilling holes, please make sure to avoid the embedded water supply line and power line
inside the wall to avoid danger.
Step 1
A line marking template is used to determine
the drilling location, level the hole location
with a leveling instrument, and mark it with a
marker.
Step 2
An electric drill is used to drill installation
holes for M8 bolt at the marked points.
Step 3
Align the distribution box with the installation
holes, tap the expansion bolts into the holes on
the wall with a hammer, install the nuts
(including elastic flat washers), and tighten the
nuts with a wrench.
If the level vial is within the
dashed range, it indicates that
the box is horizontal.