Connect the output of ATS to the incoming line terminal of the corresponding circuit breaker
(KeepON line) of the primary distribution box.
Step 2
Connect the upper wiring of RCD (Grid) to the leading-out terminal of the corresponding circuit
breaker (electricity selling/electricity utilization line) in the primary distribution box.
Step 3
Install the CT of the electricity meter to the main incoming line and connect the voltage
sampling line of the electricity meter. Please refer to "Installation of electricity meter" for details.