EasyManua.ls Logo

Emerson Daniel Senior Orifice Fitting Series - Extended time procedure

Emerson Daniel Senior Orifice Fitting Series
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Owner and operator manual Section 4: Orifice plate installation and removal instructions
3-9008-001 Rev M January 2015
“Quick change” procedure 57
6. Move the Operating Wrench (2) from the Lower Plate Carrier Shaft (6) located in the
Body (4) on the Upper Plate Carrier Shaft (7) located in the Top (14).
7. Rotate the Upper Plate Carrier Shaft (7) located in the Top (14) until the Plate Carrier
(8DM or 8DMC) stops against the Sealing Bar (9, 9HP).
Step 7 Step 8
8. Close the Equalizer Valve (1) with the Operating Wrench (2).
9. Using the Operating Wrench (2) rotate the Slide Valve Shaft (5) until it stops and the
CLOSED position specified on the Indicator Plate (5A) is in line with the Indicator Pointer
(5B).
Step 9 Step 10

Table of Contents

Related product manuals