EasyManua.ls Logo

Emerson EIM 2000 Series - Maintenance; Pressure Relief

Emerson EIM 2000 Series
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
Installation and Maintenance Manual
E2K-401-0817 Rev. 1
August 2017
Storage Instructions
1.6 Maintenance
At least once a year a check should be made of your EIM actuator.
a. Disconnect all electrical power to actuator.
b. Open Electrical Enclosure. Inspect and tighten all electrical connections.
c. Visually inspect for any electrical or mechanical damage.
Replace worn or damaged components.
d. Check lubrication consistency and level. Fill or replace if required.
1.7 Pressure Relief
During normal operation of Electric Actuator, gear temperature increase in combination
with outdoor temperature variations will cause a small pressure build-up.
EIM furnishes a Pressure Relief Vent Fitting P/N 83385. Placement on Actuator can be
determined only after eld location and position of valve has been determined.
Select the highest 1/2 NPT vent location in the Gear Box, remove 1/2 NPT Plug and replace
with P/N 83385. Possible locations of the Plugs are shown on EIM Outline Drawing.
Section 1: Storage Instructions

Other manuals for Emerson EIM 2000 Series

Related product manuals