Commissioning Levelflex M FMP40 and FMP45
32
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist “Post-installation check” (see Page 22 ff.).
• Checklist “Post-connection check” (see Page 22 ff.).
6.2 Switching on the measuring device
When the instrument is switched on for the first time, the following messages appear on the display:
"
Caution!
For the Interface version of Levelflex FMP4x, the display unit VU 331 is inteded to show the
measurement values only; The set-up should be done using the special FieldCare DTM which
comes with the device.
⇒
⇓
After 5 s, the following message appears
⇓
After 5 s, the following message appears (e.g. on HART
devices)
⇓
After 5 s or after you have pressed
F
the following
message appears
Select the language
(this message appears the first time the instrument is
switched on)
⇓
Select the basic unit
(this message appears the first time the instrument is
switched on)
⇓
The current measured value is displayed
ENDRESS + HAUSER
E
+
–