EasyManua.ls Logo

Endress+Hauser nivotester FTC 420 - Installation; Safety

Endress+Hauser nivotester FTC 420
36 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Installation
This Chapter is concerned with the mechanical installation and
electrical connection of the Nivotester FTC units. Fig. 3 gives a
view of the principle connecting elements. For information on:
probe installation
installation of the EC 61 Z electronic in the probe head or
separate housing,
see the technical documentation supplied with these items.
Safety
The Nivotester FTC 420/421 units are not intended for use with
probes operating in Ex-Areas.
The Nivotester may be installed by skilled personnel only.
When working with line power, switch off before making the
electrical connections.
Top hat rail
EN 50 022-35x15 or
EN 50 022 35x7,5
Snap-on fastener
Removable terminal
block
Release points for
front panel
Release points for
terminal blocks
Removable terminal
block
Release point
Fig. 3
Principle connecting elements of
the Nivotester FTC 420/421
Nivotester FTC 420/421 Installation
24

Table of Contents

Other manuals for Endress+Hauser nivotester FTC 420

Related product manuals