Proline Prowirl R 200 Installation
Endress+Hauser 19
A0019209
4 Layout for delta heat measurement of saturated steam and water
1 Prowirl
2 Temperature sensor
3 Heat exchanger
Q Heat flow
Protective cover
Maintain the following minimum head clearance:
222 mm (8.74 in)
6.2 Mounting the measuring device
6.2.1 Required tools
For transmitter
• For turning the transmitter housing: Open-ended wrench8 mm
• For opening the securing clamps: Allen key3 mm
For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2 Preparing the measuring device
1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.