EasyManua.ls Logo

Endress+Hauser Prosonic S FMU90 - Installation; 3.1 Incoming acceptance, transport, storage; 3.2 Mounting the field housing

Endress+Hauser Prosonic S FMU90
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Wiring Prosonic S FMU90 Flow Measurement PROFIBUS
12 Endress+Hauser
3.1.1 Cable entries of the field housing
The following openings for cable entries are prestamped on the bottom of the housing:
M20x1.5 (10 openings), M16x1.5 (5 openings), M25x1.5 (1 opening).
The required number and types of cable entries depend on the application at hand.
3.2 Terminal compartment of the DIN-rail housing
3.2.1 Single instrument
L00-FMU90xxx-04-00-00-xx-003
1.
2.

Other manuals for Endress+Hauser Prosonic S FMU90

Related product manuals