EasyManua.ls Logo

enervent eWind Series - Page 21

Default Icon
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21Installation instructions
EN
NOTE: Make sure to leave the cables loose in
case the unit must be taken down for some
reason.
NOTE: It is essential for the proper disposal
of condensate water that a Pingvin unit is
installed slightly tilted backwards. The unit
is automatically installed tilted in the ceiling
installation plate.
Taking down ceiling installed units
DANGER
DANGER: Before taking the unit down, make
sure that the unit’s supply voltage has been
switched o.
CAUTION
CAUTION: Make sure you are holding the unit
in its place when opening the locking plates.
When the locking plates are opened, the unit’s
back side disengages from the ceiling plate.
Make sure that you have enough space under
the unit for it to swing down.
To take down:
1. Open the security screws.
2. Open the electrical cabinet and disconnect the
cables coming from the ceiling.
3. Holding the unit securely in its place, twist both
of the locking plates open (towards you) using a
screwdriver.
4. Lift down the unit.
7. Connect the cable(s) coming through the ceiling
plate to the electrical enclosure box.
Make sure that the unit is hanging straight,
directly in the middle of the ceiling plate.
8. Push the base of the unit upwards until it locks
onto the ceiling plate.
9. Secure the unit in place by tightening the two
security screws on both sides of the ceiling plate.
The locking screws for Pinion units are below
the ventilation unit.
10. Put the heat exchanger back in the unit and close
the electrical cabinet door.
11. Reinstall the doors if you removed them before the
lifting.
12. Make the applicable electrical and plumbing
connections according to the electrical and
principal diagram at the end of this manual.
CLICK
CLICK

Table of Contents

Related product manuals