EasyManua.ls Logo

Envicool XRow Series - Chapter 2 Onsite Preparation and Installation; Precautions for Installation; Storage and Operation Environment Requirements of Xrow Series Row Air Conditioner

Default Icon
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Shenzhen Envicool Technology Co., Ltd.
6
Chapter 2 Onsite Preparation and Installation
2.1 Precautions for installation
Note
When handling the unit, you must keep the unit vertical. It is prohibited to handle the unit
horizontally or upside down. Any damage caused to the unit for failing to observe this instruction
shall not be covered by the warranty.
Before installing the equipment, you should decide how to modify the building to facilitate the
piping, cabling and duct construction. Please install the units strictly according to the relevant
drawings. For the reserved installation and maintenance space, please refer to the engineering
dimension drawing provided by the manufacturer.
Indoor unit must be installed vertically,outdoor condenser should be installed in the well-ventilated
area.
2.1.1 Storage and operation environment requirements of XRow
series row air conditioner
For the storage and operation environment requirements of the XRow series air conditioner, please
refer to Table 2-1 and Table 2-2.
Table 2-1 Storage environment requirement
Item
Requirement
Storage environment
Indoor, clean, dust free, etc
Ambient temperature
-40ºC~70ºC
Relative humidity
5%RH-90%RH
Storage time
The total transportation and storage time shall not exceed 6 months; otherwise, the performance
shall be recalibrated.

Table of Contents

Related product manuals