EasyManua.ls Logo

Envicool XRow Series - Chapter 6 System Testing and Maintenance; Temperature Control; Cooling; Reheating

Default Icon
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Shenzhen Envicool Technology Co., Ltd.
61
Chapter 6 System testing and maintenance
This chapter details the control and operation of XRow series air conditioner.
Warning
The equipment is equipped with high voltage. Turn off the power supply before checking the
inside part of the equipment. When the air switch of the unit is off, it’s possible that the external
connection power supply cable is still live.
6.1 Temperature Control
6.1.1 Cooling
To test the cooling function, make the temperature set lowest value 18ºC . The system will make
cooling request and start the refrigeration cycle (regardless of the temperature alarm). Adjust the
temperature set value back to the desired value after finishing the test.
6.1.2 Reheating
To test the heating function, make the temperature set value 10ºC higher than the indoor temperature.
The system will make heating request and start the heating cycle (regardless of the temperature
alarm). Adjust the temperature set value back to the desired value after finishing the test.
6.1.3 Humidifying
To test the humidifying function, make the humidity set value 10% higher than the indoor humidity
value RH. After a short delay, the humidifier will fill in water gradually and produce the steam.
Adjust the humidity set value back to the desired value after finishing the test.
6.1.4 Floor flooding detection
Put the immersion electrode in the water, then the unit will display the floor flooding alarm and shut
down. Dry the immersion electrode after the test. The alarm display will disappear when you
manually reset the flooding alarm in the alarm menu. The fan will start up after time delay, and the
alarm will not occur again.

Table of Contents

Related product manuals