24
8) Install the cover and secure the screws.
2.6 Operating the inverter/charger
1) Connect the battery circuit breaker.
2) Turn the rocker switch on the side of the inverter/charger to the ON state. The inverter/charger
generally works when the indicator is ON solid.
Ensure that the battery connection is correct and the battery circuit breaker is turned
on first. And then, connect the PV array and utility circuit breakers after the
inverter/charger running normally. Again, we won't assume any responsibility for not
following the operation.
3) Connect the PV circuit breaker.
4) Connect the circuit breaker at the utility input.
5) After the AC output is normal, turn on the AC loads one by one. The inverter/charger typically works
as per the set mode. Do not turn on all the loads simultaneously to avoid protection due to a large
transient impulse current.
When supplying power for different AC loads, it is recommended to turn on the load
with a large impulse current. And then turn on the load with a smaller impulse
current after the load output is stable.
If the inverter/charger is not operating correctly or the LCD or the indicator shows
an abnormality, please refer to "Troubleshooting" or contact us.