5. General Maintenance
96 Safety and Installation (T, VT / EPSON RC+ 7.0) Rev.15
5. General Maintenance
This chapter describes maintenance inspections and procedures. Performing
maintenance inspections and procedures properly is essential for preventing trouble
and ensuring safety.
Be sure to perform the maintenance inspections in accordance with the schedule.
5.1 Schedule for Maintenance Inspection
Inspection points are divided into five stages: daily, monthly, quarterly, biannual,
and annual. The inspection points are added every stage.
If the Manipulator is operated for 250 hours or longer per month, the inspection
points must be added every 250 hours, 750 hours, 1500 hours, and 3000 hours
operation.
Inspection Point
Daily Monthly Quarterly Biannual Annual
Overhaul
(replacement)
1 month
(250 h)
Inspect every day
2 months
(500 h)
3 months
(750 h)
4 months
(1000 h)
5 months
(1250 h)
6 months
(1500 h)
7 months
(1750 h)
8 months
(2000 h)
9 months
(2250 h)
10 months
(2500 h)
11 months
(2750 h)
12 months
(3000 h)
13 months
(3250 h)
20,000 h
h = hour

Table of Contents

Other manuals for Epson VT6-A901S

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Epson VT6-A901S and is the answer not in the manual?

Epson VT6-A901S Specifications

General IconGeneral
BrandEpson
ModelVT6-A901S
CategoryRobotics
LanguageEnglish

Related product manuals