EasyManua.ls Logo

ErgoPack 700X - Sealing Control

ErgoPack 700X
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8.3 Sealing control
Control the sealing regularly. The welding time must be checked in accordance
with point 7.9 and changed if necessary when the straps are welded badly.
1
2 3
1 Good welding: The whole sealed surface has been properly welded without
any extra material being squeezed out to the side.
2 Bad welding: The surface has been unevenly welded, the selected welding
time is too short.
3 Bad welding: Surplus material has been squeezed out to the side, the
selected welding time is too long.
Fig. 77
-53-
Warning!
Improper welded straps cannot secure the loads and can therefore cause
injuries.
Never transport or move goods with improper welded straps.

Table of Contents

Related product manuals