EasyManua.ls Logo

ESAB A2TF J1 - Connections

ESAB A2TF J1
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 INSTALLATION
0449 165 160
- 13 -
© ESAB AB 2020
Adjusting the braking torque:
1. Turn the red handle to the locked
position.
2. Insert a screwdriver into the springs
in the hub.
Turn the springs clockwise to
reduce the braking torque.
Turn the springs
counter-clockwise to increase
the braking torque.
NOTE!
Turn both springs the same amount.
3.7 Connections
3.7.1 General
The PEK must be connected by a qualified person. See separate instruction manual.
For connection of welding power source, see separate instruction manual.

Table of Contents

Related product manuals