EasyManua.ls Logo

EVBox Iqon - Commissioning Report

EVBox Iqon
54 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
b. For a charging installation connected to Wi-Fi:
The Wi-Fi connection.
The applicable Charging Management Platform (CMP). (Do not manually add the CMP
URL.)
The charge current.
c. The following settings can also be configured using the app:
Charger Access Control. Select the required access control for the charging station.
LED Ring brightness.
LED Ring ON or OFF when Iqon is in idle mode.
Charging station name.
Adding and removing charge cards.
Updating the firmware.
7. Follow the instruction in the app to reboot Iqon.
Iqon is connected to a CMP and is ready to use.
4.5.5. Commissioning report
Complete the Commissioning Report that is supplied with Iqon. For a Hub-Satellite installation,
complete only one report. Send a copy of the report to the CPO. The installer should keep the original
of the report.
EN
4. Installation instructions
36

Related product manuals