EasyManua.ls Logo

FAAC C720 - Masonry for Foundation Plate

FAAC C720
32 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.2 MASONRY FOR FOUNDATION PLATE
1. Assemble the foundation plate as shown in Fig. 4.
2. The foundation plate must be located as shown in
Fig. 5 (right closing) or Fig. 6 (left closing) to en-
sure the rack and pinion mesh correctly.
3. Prepare a foundation plinth as shown in Fig. 7 and wall in the founda-
tion plate, supplying one or more sheaths for routing electric cables
through the hole in the foundation plate.
Using a spirit level, check if the plate is perfectly level.
Wait for the cement to set.
4. Lay the electric cables for connection to the accessories and power
supply as shown in Fig. 3.
To facilitate the connections in the control unit, pull out the
leads by at least 30 cm from the hole on the plate.
5

Other manuals for FAAC C720

Related product manuals