30
Verifying the functionality of the circuit
The purpose of verifying the circuit's functionality is to ensure the circuit can detect faults.
1. Connect one of the loops’ SH terminals to the ground.
2. Verify that the fire panel correctly reports the fault
3. Remove any connection points previously made.
Figure 16: Control panel and 38Ah Batteries metal box connection (accessory item)
Nuts on 38Ah Batteries cabinet
38Ah Batteries cabinet (Accessory item)
Holes for cabinet mounting
Connector for Thermal probe
connections