21 Installation Guide Doc. version 2.0
Provide installation records FireClass Panels and Repeaters
9 Provide installation
records
Provide site personnel with all relevant information,
such as cable routing diagrams and wiring test results.
10 Make final checks
1 Check that all power and signal cabling connections
are secure and using the correct polarity.
2 Check that all power and signal cables are neatly
routed and arranged in the housings.
3 Check that the earth cables connections are secure.
4 Check that all installed cables and signal wires have
adequate labelling.
5 Check to make sure the housings are clean and tidy
ā for example, remove all wiring off-cuts.