EasyManua.ls Logo

Flowserve VTP - Page 22

Flowserve VTP
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 22 of
7
provision of
c
lead to failu
r
outside the t
The foundati
rigid support
expected str
e
Concrete fo
u
installed in s
l
holes in the
m
below. Slee
v
moldable m
a
When a suc
t
type "TF" di
s
provide per
m
motor.
base, they
m
to grouting.
A
lways shim
the leveling
n
done otherw
the structura
separation o
f
recommend
a
industry sta
n
Detail of a
t
Lev
e
4.3.1
dis
c
MOUNTING PL
A
NON-BOND
I
MOLDABLE MA
T
FOUNDA
T
VERTIC
7
6
c
orrect found
r
e of the pum
p
erms of the
w
on must con
s
to the discha
e
sses that m
a
u
ndations sho
l
eeves that al
l
m
ounting plat
e
v
e should be
f
a
terial after sl
e
ion barrel is
s
s
charge head,
m
anent, rigid
s
If leveling
n
m
us
t
be backe
near founda
t
n
uts. Now tig
i
se there is a
l natural freq
u
f
the base fro
m
A
ll found
a
a
tions should
n
dards.
t
ypical found
a
e
ling of pu
m
c
harge head
A
TE
NG
T
ERIAL
T
ION
A
L TURBIN
E
ation and ins
p
and, as su
c
w
arranty.
s
ist of materia
rge head and
a
y be encoun
t
uld have anc
h
l
ow alignmen
t
e
as illustrate
d
f
illed with no
n
e
eve is set in
s
upplied as in
the suction
v
s
upport for th
e
n
uts are use
d
d
off as far a
s
t
ion bolts and
h
ten the foun
d
risk of signifi
c
u
ency that co
u
m
the grout.
a
tion / anchor
be verified b
y
tion bolt, gro
u
m
ps mounted
flange
A
N
E
PUMPS
(
V
T
tallation may
c
h, would be
l
that will affo
r
will absorb
t
ered in servi
c
h
or bolts
t
and have
d
in the detail
n
-bonding
place.
the case of t
h
v
essel must
e
pump and
d
to level the
s
possible pri
o
then back of
f
d
ation bolts.
c
antly lowerin
g
u
ld result in
bolt
y
prevailing
u
ted.
on the
A
NCHOR BOLT
GROUT
N
UT
T
PS
)
CENTR
I
r
d
c
e.
h
e
o
r
f
If
g
E
x
The p
u
aligne
d
asse
m
precisi
the m
o
flange
0.16
m
the gr
o
Check
is still
l
torque
record
friendl
y
requir
e
4.3.2
The s
o
aligne
d
by usi
n
level.
L
mount
i
needs
using
s
least
7
Reche
after t
h
install
a
pit an
d
the sol
Check
respe
c
in./ft)
a
should
DI
S
HEA
D
37
2
373
IFUGAL PU
M
x
ample of a t
y
m
u
mp assembl
d
with the an
c
m
bly is levele
d
i
on machinist
o
tor mountin
g
mounting su
m
m/m (0.002
i
o
ut to set for
a
k
to make sur
e
l
evel to withi
n
e
the nuts [37
3
ed for future
Directly
m
y
for service.
e
s re-leveling
Leveling o
soleplate
o
leplate [23] i
s
d
with the an
c
n
g a master l
e
L
evels should
i
ng surfaces.
to be leveled
s
hims and gr
o
7
2~80 hours
b
e
ck the solepl
a
h
e grout is se
t
a
tion. Lower t
h
d
align the dis
c
l
eplate bolts[
3
to make sur
e
c
t to the solep
a
nd final torq
u
d
be recorded
S
CHARGE
D
FLANGE
CONCRET
E
2
M
PS ENGLI
S
y
pical discha
r
m
ounting fla
n
y [101] is lo
w
c
hor bolts [3
7
d
by using a
m
t
's level. Lev
e
g
flange. The
rface needs
t
i
n./ft) using s
h
a
t least 72~8
0
e
that the mo
t
n
0.16 mm/m
3
]. The leveli
n
reference.
m
ounted pum
p
Re-installati
o
and re-grou
t
o
f pumps mo
s
first lowered
c
hor bolts. Th
e
e
vel or a prec
i
be taken on
t
The soleplat
e
to within 0.1
6
o
ut. Allow the
b
efore the pu
m
a
te mounting
t
and then pr
o
h
e pump ass
e
c
harge head
f
3
72].
e
that the pu
m
p
late to within
u
e the nuts [3
7
for future ref
e
E
S
H 7156922
4
flows
e
r
ge head wit
h
n
ge
w
ered into the
7
2]. The pum
p
m
aster level
o
e
ls should be
t
discharge he
t
o be leveled
h
ims and gro
u
0
hours.
t
or mounting
(0.002 in./ft)
n
g data is to
b
p
s are not us
e
on of these p
t
ing.
unted on a
g
d
into the pit a
n
e
soleplate is
i
sion machini
s
t
he equipme
n
e
mounting s
u
6
mm/m (0.0
0
grout to set f
o
m
p is installe
d
surface level
n
o
ceed with th
e
e
mbly [101] i
n
f
lange bolt h
o
m
p is still level
0.16 mm/m (
0
7
3]. The level
i
e
rence.
4
– 02-15
e
rve.com
h
the
pit and
p
o
r a
t
aken on
ad
to within
u
t. Allow
flange
and final
b
e
e
r
p
umps
g
routed
n
d
leveled
s
t's
n
t
u
rface
0
2 in./ft)
o
r at
d
.
n
ess
e
pump
n
to the
o
les to
with
0
.002
i
ng data
101

Related product manuals