EasyManua.ls Logo

Flowserve VTP - Grouting

Flowserve VTP
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 23 of
7
Exam
p
Lev
e
4.3.3
The suction
and aligned
flange is lev
e
precision m
a
the equipm
e
flange moun
0.16 mm/m
(
the grout to
s
pump is inst
a
surface leve
proceed wit
h
assembly [1
0
discharge h
e
[372].
Check to m
a
respect to th
(0.002 in./ft)
leveling dat
a
Example of
a
VERTIC
7
6
p
le of pump
m
e
ling of pu
m
barrel [315] i
s
w
ith the anc
h
e
led by using
a
chinist's lev
e
e
nt mounting
s
ting surface
n
(
0.002 in./ft)
u
s
et for at lea
s
a
lled. Reche
c
lness after th
e
h
the pump in
0
1] into the b
a
e
ad flange b
o
a
ke sure that
t
e barrel flan
g
and final tor
q
a
is to be rec
o
a
pump install
A
L TURBIN
E
m
ounted on a
m
ps with the
s
s
first lowere
d
h
or bolts. The
a master lev
e
l. Levels sho
s
urfaces. Th
e
n
eeds to be l
e
u
sing shims
a
s
t 72~80 hou
r
c
k the barrel
m
e
grout is set
stallation. Lo
w
a
rrel and alig
o
lt holes to th
e
t
he pump is
s
g
e to within 0.
q
ue the nuts [
o
rded for futu
r
ed with a suc
E
PUMPS
(
V
T
soleplate
s
uction barr
e
d
into the pit
suction barr
e
el or a
uld be taken
o
e
suction barr
e
e
veled to wit
h
a
nd grout. All
o
r
s before the
m
ounting
and then
w
er the pum
p
n the
e
flange bolts
s
till level with
16 mm/m
373]. The
r
e reference.
tion barrel.
T
PS
)
CENTR
I
e
l
e
l
o
n
e
l
h
in
o
w
p
4.3.4
The s
o
and al
i
suctio
n
ancho
r
solepl
a
using
a
Level
s
surfac
e
needs
in./ft)
u
A
llow
t
the pu
surfac
e
proce
e
asse
m
disch
a
[372].

Che
c
res
p
(0.
0
level
i
Exa
m
G
4.4
Wher
e
A
fter
a
the co
u
shoul
d
engin
e
Flows
e
IFUGAL PU
M
Leveling o
mounted
o
o
leplate [23] i
s
igned with th
e
n
barrel [315]
r
bolts. Torq
u
a
te. The suc
t
a
master lev
e
s
should be t
a
e
s. The sucti
o
to be levele
d
u
sing shims
t
he grout to s
mp is install
e
e
levelness
a
e
d with the p
u
m
bly [101] int
o
a
rge head fla
n
c
k to make s
u
p
ect to the b
a
0
02 in./ft) an
d
i
ng data is to
m
ple of pump
w
G
routing
e
applicable,
g
a
dding pipe
w
u
pling align
m
d
then be gro
u
e
ering practic
e
e
rve service
c
M
PS ENGLI
S
o
f pumps wit
h
o
n a soleplat
s
first lowere
d
e
anchor bolt
s
into the pit a
u
e nuts to se
c
t
ion barrel fla
e
l or a precisi
o
a
ken on the e
q
o
n barrel flan
d
to within 0.1
s
and grout
u
et for at leas
t
e
d. Recheck t
h
a
fter the grou
t
u
mp installati
o
o
the barrel a
n
n
ge bolt hole
s
u
re that the p
u
a
rrel flange to
d
final torque
be recorded
w
ith a suction
soleplate
g
rout in the f
o
w
ork connecti
o
m
ent, the mou
u
ted in accor
d
e. If in any d
c
enter for ad
v
S
H 7156922
4
flows
e
h
suction b
a
t
e
d
onto the fo
u
s
. Then, low
e
nd aligned w
i
c
ure suction
b
nge is levele
d
o
n machinist'
s
q
uipment mo
ge mounting
6 mm/m (0.
0
u
nder the so
l
t
72~80 hour
s
h
e barrel mo
u
t
is set and th
o
n. Lower th
e
n
d align the
s
to the flang
e
u
mp is still le
v
within 0.16
m
the nuts [37
3
for future ref
e
barrel moun
t
o
undation bol
t
o
ns and re-c
h
nting plate/s
o
d
ance with g
o
oubt, please
v
ice.
4
– 02-15
e
rve.com
a
rrel
u
ndation
e
r
ith the
b
arrel to
d
by
s
level.
unting
surface
0
02
l
eplate.
s
before
u
nting
en
e
pump
e
bolts
v
el with
m
m/m
3
]. The
e
rence.
t
ed on a
t
s.
h
ecking
o
leplate
o
od
contact

Related product manuals