EasyManua.ls Logo

Flowserve VTP - Installation; Location, Preparation, and Foundation

Flowserve VTP
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 21 of
7
Acc
3.3.8
A
ccessories
customer.
Perf
o
3.4
This product
specification
s
The followin
g
help with the
temperature,
data. If requi
application c
a
Op
e
3.4.1
Pumped liqui
d
limits*
Maximum am
b
temperature*
Maximum pu
m
*Subject to
w
Special desi
g
pumps oper
a
limits. Cont
a
available for
4 INST
A
Equip
m
must compl
y
regulations.
p
otentially e
x
Loc
a
4.1
When equip
m
months, a c
o
accordance
w
located to all
o
maintenanc
e
lifting and sh
o
supply of liq
u
arrangemen
t
Ins
p
4.1.1
Six months
p
Flowserve P
employed to
and the facili
noticed, the
F
may require
equipment i
n
some comp
o
VERTIC
7
6
essories
may be fitte
d
o
rmance a
n
has been sel
e
s
of the purch
a
g
data is includ
installation. It
materials and
r
ed, a definitiv
e
a
n be obtaine
d
e
rating limits
d
temperature
b
ient
m
p speed
w
ritten agree
m
g
ns and mat
e
a
ting above
a
a
ct Flowserv
e
your specifi
c
A
LLATION
m
ent operate
d
y
with the rel
e
See section
x
plosive atm
o
tion
m
ent has bee
n
o
mplete inspe
c
w
ith section 2
.
o
w room for a
e
and inspecti
o
o
uld be as cl
o
u
id to be pum
p
t
drawing for t
h
p
ection prior
p
rior to the sc
h
u
mp Division
conduct an i
n
ty. If any det
e
F
lowserve P
u
a partial or c
o
n
cluding resto
o
nents.
A
L TURBIN
E
d
when speci
f
n
d Operat
i
e
cted to mee
t
a
se order. S
e
ed as additio
n
is typical and
seal type ma
y
e
statement f
o
d
from Flowse
r
5 ºC (40 ºF) to
+
Up to +40 ºC (1
0
refer to the na
m
m
ent from Fl
o
e
rials may be
a
nd below th
e
e
for upgrade
c
application.
d
in hazardo
u
e
vant explosi
o
1.6.4, Produ
c
o
spheres.
n
in storage f
o
c
tion should b
e
.
4.3. The pum
ccess, ventila
o
n with ample
o
se as practic
a
p
ed. Refer to
t
h
e pump set.
to installati
o
h
eduled insta
l
representati
v
n
spection of t
h
e
rioration of
e
mp Division
r
o
mplete dism
a
ration and re
p
E
PUMPS
(
V
T
f
ied by the
i
on Limits
the
e
e section 1.5.
n
al informa
t
ion
factors such
a
y
influence thi
s
o
r your particul
r
ve.
+
80 ºC (176 ºF)
0
4 ºF)
m
eplate
o
wserve.
available for
se specified
options
u
s locations
o
n protection
c
ts used in
o
r greater tha
n
e
conducted i
n
p should be
tion,
headroom fo
r
a
ble to the
t
he general
o
n
l
lation date, a
e is to be
h
e equipment
e
quipment is
r
epresentativ
e
a
ntling of the
p
lacement of
T
PS
)
CENTR
I
to
a
s
s
ar
n
6
n
r
e
P
4.2
The p
u
ventila
t
headr
o
practic
Refer
t
dimen
s
4.2.1
The fo
actual
a) M
a
p
o
b) C
h
u
p
c) C
h
d) C
h
wi
l
e) C
h
a
n
three
p
should
neces
s
O
n
a
g
cl
u
O
n
a
g
male
s
shaft
c
avoid
e
conne
c
impro
p
to the
p
F
4.3
pump
depen
d
vibrati
o
IFUGAL PU
M
P
reparati
o
u
mp should b
e
t
ion, mainten
a
o
om for lifting
a
c
able to the su
t
o the general
s
ions and det
a
General in
s
o
llowing chec
k
installation.
a
ke sure that
o
wer supply s
y
h
eck the sum
p
.
h
eck the liqui
d
h
eck the inst
a
ll safely hand
h
eck all pum
p
n
y shipping a
n
Alw
a
p
laces when
l
d
be attempte
d
s
ary for a suc
n
hollow shaf
t
g
ainst the sh
a
u
tch
n
solid shaft
d
g
ainst the cou
A
pp
s
haft threads
c
onnection.
E
e
d.
A
lw
a
c
ting driver to
p
er motor dire
p
ump.
F
oundatio
The
units to their
ds on the siz
e
o
n limitations
M
PS ENGLI
S
o
n
e
located to al
a
nce and insp
a
nd should b
e
pply of liquid
t
arrangement
a
ils.
stallation c
h
k
s should be
motor name
p
y
stem match
p depth and
p
d
level in the
a
llation equip
m
d
le the pump
w
p
connection
s
n
d handling r
e
a
ys support
s
l
ifting or inst
a
d
without ade
q
cessful instal
l
t
drivers, che
c
a
ft size, whic
h
d
rivers, chec
k
u
pling bore si
z
ly thread lub
r
only at the ti
m
E
xcess lubric
a
a
ys check m
o
o
pump. Res
e
e
ction can ca
u
n/Anchor
B
re are many
m
foundations.
e
of the pum
p
. Non-compl
S
H 7156922
4
flows
e
low room for
a
ection with a
m
e
as close as
t
o be pumped
drawing for t
h
h
eck-list
made before
p
late ratings
a
correctly.
p
ump length
m
sump.
m
ent to be s
u
w
eight and si
s
(bolts, nuts
e
e
lated proble
m
s
hafting in at
l
a
lling. No ins
t
q
uate equip
m
l
ation.
c
k the clutch
h
must go thr
o
k
the motor s
h
z
e
r
icant sparing
m
e of making
a
nt should b
e
o
tor rotation b
e
e
rve rotation
d
u
se extensive
B
olts
m
ethods of i
n
The correct
m
p
unit, its loc
a
iance with th
e
4
– 02-15
e
rve.com
a
ccess,
m
ple
.
h
e pump
starting
a
nd the
m
atch-
u
re that it
ze.
e
tc) for
m
s.
l
east
t
allation
m
ent
size
o
ugh the
h
aft size
ly to
up
e
e
fore
d
ue to
damage
n
stalling
m
ethod
a
tion and
e

Related product manuals