Flowserve VTP - Commissioning, Startup, Operation and Shutdown; Pre-commissioning and Lubrication

Flowserve VTP
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 35 of
7
5 COM
M
OPE
R
by fully quali
safety while
Pre-
c
5.1
The gland is
to be in plac
e
Mechanical
s
and pressur
e
a) Pumps
w
bearing
s
avoid ru
n
perform
a
attache
d
b) For can
p
complet
e
procedu
r
dependi
n
c) Check t
h
(Couplin
g
clockwis
e
d) The pu
m
correct
a
e) Check t
h
sys., lub
r
f)
A
ll pipe
w
auxiliary
and mu
s
of all co
n
suction
v
shall be
c
g) Turn the
a lever,
t
rotor mu
s
resistan
c
bearing
s
h) Check t
h
to the m
a
precauti
o
VERTIC
7
6
M
ISSIONIN
R
ATION A
N
These op
e
fied personn
e
pump commi
c
ommissi
o
to be filled
w
e
. Flush pipi
n
s
eals to be c
h
e
.
w
ith the enclo
s
s
must be fille
d
n
ning dry and
a
nce of the p
u
to the pump
p
umps check
e
filling of the
p
r
e can take fr
o
n
g on the kin
d
h
e direction o
f
g
spacer dis
m
e
when view
e
m
p rotor and t
h
a
xial position.
h
e readiness
o
r
ication syste
m
w
ork, includin
g
pipe work, m
u
s
t be absolute
l
n
nections of t
h
v
alve must be
c
losed or par
t
pump by ha
n
t
o check the f
r
s
t turn unifor
m
c
e may be fel
t
s
and seals.
h
e readiness
o
a
nual for the
d
o
ns are in pla
c
A
L TURBIN
E
G, START
U
N
D SHUTD
O
e
rations must
e
l. Turn off p
o
ssioning is in
o
ning Proc
e
w
ith grease a
n
n
g to be che
c
h
ecked for le
a
s
ing tubes an
d
d
with the pro
p
to guarantee
u
mp. A separ
a
(see detail in
all vent conn
e
p
ump. The v
e
o
m 10 minute
s
d
of fluid .
f
rotation of th
e
m
antled). Sho
e
d from the dri
h
e shaft seal
m
o
f all auxiliary
m
etc.,) for st
a
g
the internal
u
st be conne
c
l
y tight. Chec
h
e auxiliary pi
p
open, the dis
t
ially open as
n
d, if required
w
r
ee rotation o
f
m
ly and noisel
t
due to the fri
c
o
f the driver f
o
d
river to be s
u
c
e to energiz
e
E
PUMPS
(
V
T
U
P,
O
WN
be carried o
u
o
wer supply
f
progress.
e
dure
n
d flush suppl
c
ked for leak
s
a
ks, flush flo
w
d
oil-lubed
p
er lubricant t
o
acceptable
a
te oil tank is
s
ection 5.2.2
)
e
ctions for
e
nting
s
up to 2 hou
r
e
pump
uld be count
e
ver end.
m
ust be in
systems (se
a
a
rtup.
and the
c
ted correctly
k the tightnes
p
e work. The
charge valve
required.
w
ith the help
o
f
the rotor. Th
essly. Some
c
tion in the
o
r startup. Re
f
u
re that all
e
the motor.
T
PS
)
CENTR
I
u
t
f
or
y
s
.
w
o
)
.
r
s,
e
r
a
l
s
o
f
e
f
er
P
5.2
Other
t
seal a
n
requir
e
the su
c
repac
k
hydro
c
Teflon
bearin
g
longer
flushe
d
agent.
for sh
o
thorou
be in
a
instru
c
5.2.1
Open l
fluid w
h
below
t
pre or
that th
e
flush fl
o
A
ll op
e
more t
h
be ad
e
5.2.1.
1
A
llow
f
minut
e
pre-lu
b
(15 ft)
The fit
t
head.
5.2.1.
2
In gen
e
provid
e
conne
c
with a
liquid
f
reliabl
e
lubrica
syste
m
IFUGAL PU
M
P
ump Lub
t
han the stuf
f
n
d/or linesha
f
e
further peri
o
c
tion bearing
k
ed when req
c
arbons or h
a
suction bear
g
s packed. I
f
storage peri
o
d
and cleane
d
It is not nec
e
o
rt or long-ter
ghly with the
Re-chec
k
a
ccordance
w
c
tions supplie
d
Open line
s
ineshaft bea
r
h
ere the stati
c
the discharg
e
pos
t
-lubricati
o
e
gland or se
a
ow.
e
n lineshaft p
u
h
an 9 m (30
f
e
quately pre-l
u
Pre-lubri
c
1
f
lush water t
o
e
s for pumps
o
b
e duration b
y
additional sh
a
t
ings for pre-l
T
y
pical
p
2
(
exampl
e
e
ral all W typ
e
d with a sta
n
c
tion. Fabric
a
special pipin
g
f
low onto the
It is the r
e
e
pre-lube sy
s
a
tion. Flowse
r
m
s or access
o
M
PS ENGLI
S
ricants
f
ing box lubri
c
f
t lubrication,
o
dic lubricati
o
on the bowl
a
uired. Pump
s
a
ve carbon, r
u
ings do not h
f
the pump w
o
d, the beari
n
d
by using a
s
e
ssary to re
m
m storage a
s
lubrication oi
k
ing the moto
r
w
ith the motor
d separately
w
s
haft lubrica
t
r
ings are lubri
c
c
water level
i
e
head and wi
o
n. Care is t
o
a
l is supplied
u
mps where t
h
f
t) below the
d
u
bricated bef
o
c
ation durat
i
o
flow down t
h
over 9 m (30
y
at least 15
m
aft length be
y
l
ube are prov
p
r
e
-lube pip
e
e
s
(
a
)
thru
(
d
)
e cast disch
a
n
dard size pi
p
a
ted dischar
g
g
arrangeme
n
shaft.
e
sponsibility o
f
s
tem to achie
v
r
ve will not su
o
ries with the
p
S
H 7156922
4
flows
e
c
ation, mech
a
the pump wil
o
n. On water
a
ssembly sh
o
s
that pump
u
bber, epoxy
ave the sucti
o
ill be started
a
n
gs should b
e
s
uitable clea
n
m
ove the oil s
p
s
this will mix
u
l.
r
lubrication
s
manufactur
e
w
ith the pum
t
ion
c
ated by the
p
i
s less than 9
ll usually not
r
o
be taken to
e
with the requ
i
h
e static wat
e
d
ischarge he
a
o
re starting th
i
on
h
e shaft for 4
5
ft) and incre
a
m
inutes for e
v
y
ond 20 m (6
5
ided at the di
e
connection
))
a
rge heads a
r
p
e fitting for
p
g
e heads are
n
t to allow pr
e
f
the user to i
n
v
e the pump
p
pply these ty
p
p
ump.
4
– 02-15
e
rve.com
a
nical
l not
pumps,
o
uld be
or
o
n
a
fter a
e
first
n
ing
p
rayed
up
s
hould
e
r’s user
p.
p
umped
m (30 ft)
r
equire
e
nsure
i
red
e
r level is
a
d should
e pump.
5
a
se the
v
ery 5 m
5
ft).
scharge
r
e
p
re-lube
fitted
e
-lube
n
stall a
p
re-
p
es of

Related product manuals