EasyManua.ls Logo

Flowserve VTP - Lifting, Assembly, and Alignment

Flowserve VTP
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 24 of
7
Grouting pr
o
unit and fou
n
running equi
Care should
contact with
plate, suctio
n
tightened af
t
VERTIC
7
6
o
vides solid c
o
n
dation that
p
pment and d
a
be taken to
e
grout betwe
e
n
can and fo
u
Foundatio
t
er the grout
h
A
L TURBIN
E
o
ntact betwe
e
p
revents later
a
a
mpens reso
e
nsure maxi
m
e
n the pump
b
u
ndation (no
v
n bolts shoul
d
h
as been cur
e
E
PUMPS
(
V
T
e
n the pump
a
l movement
n
ant vibratio
n
m
um surface
b
ase, sole
v
oids).
d
only be full
y
e
d.
T
PS
)
CENTR
I
of
n
s.
y
L
4.5
Motor
s
It is th
e
the m
o
detail
e
piping
separ
a
pump
s
separ
a
and al
i
Flows
e
4.5.1
4.5.1.
1
See lif
t
4.5.1.
2
The fo
requir
e
a) T
w
lo
w
b) T
w
c) T
w
at
t
d) Pi
p
co
m
m
e) G
e
w
r
w
r
cl
o
f) T
h
st
e
inside
individ
and s
k
4.5.1.
3
a) Cl
e
ot
h
b) Fl
u
w
a
c) R
e
su
d) Cl
e
eq
IFUGAL PU
M
L
ifting an
d
s
may be sup
e
responsibili
o
tor is assem
e
d in section
4
and the pum
a
tely or as ful
size and wei
g
a
tely, it is the
ign the pump
e
rve’s install
a
Installatio
n
unassemb
Lifting
1
ft
ing methods
Equipm
e
2
installati
o
llowing list co
e
d for installa
t
w
o (2) mobile
w
ering the pu
m
w
o (2) steel cl
a
w
o (2) sets of
t
aching to the
p
e clamp for l
o
lumn pipe.
A
m
(3/4 in.) di
a
e
neral purpo
s
r
enches, soc
k
r
enches, wire
o
th.
h
read sealing
e
el and light
m
Parts an
d
shipping con
ual package
s
k
ids for attac
h
Uncratin
g
3
pump
e
an the parts
h
er foreign m
a
u
sh the pum
p
a
ter. Clean a
l
e
move any ru
s
rfaces with fi
n
e
an all threa
d
q
uipment.
M
PS ENGLI
S
d
Assembl
y
plied separa
t
ty of the inst
a
bled to the p
u
4
.5. Dischar
g
p assembly
a
ly assemble
d
g
ht. If the par
t
customer’s r
e
with driver t
o
a
tion instructi
o
n
of pumps
t
b
led
in section 2.
3
e
nt and tools
o
n of unass
e
vers the prin
c
t
ion.
cranes capa
b
mp and/or m
o
a
mps of suita
chain tongs
&
pump and m
ifting bowl as
s
A
pproximately
a
meter rope
m
s
e hand tools,
k
et set, screw
d
brush, scrap
e
compound d
e
m
achinery oil.
d
accessories
tainers or att
a
s
. Inspect all
h
ed parts bef
o
g
and clean
in
of any dirt, p
a
a
tter.
p
inside and o
u
l
l machined s
u
s
t spots foun
d
n
e emery clot
h
d
ed connectio
S
H 7156922
4
flows
e
y
t
ely from the
p
a
ller to ensur
e
u
mp and alig
n
g
e head colu
m
a
re supplied
e
d
depending
u
t
s are shippe
e
sponsibility
t
o
the satisfac
t
o
ns.
t
hat are ship
3
.
s
required fo
r
e
mbled pum
p
c
ipal tools/ite
m
b
le of hoisting
o
tor.
ble size.
&
cable sling
fo
otor lifting ey
e
sembly and t
h
4.5 m (15 ft)
o
m
ay be requir
e
pipe wrench
e
d
rivers, Allen
e
r and fine e
m
e
signed for st
a
may be plac
e
a
ched to skid
containers,
c
o
re discardin
g
ing
of unass
e
a
cking materi
a
u
tside with cl
e
u
rfaces.
d
on the mac
h
h
.
ns and any a
c
4
– 02-15
e
rve.com
p
umps.
e
that
n
ed as
m
n
e
ither
u
pon the
d
t
o install
t
ion of
ped
r
p
s
m
s
and
fo
r
e
s.
h
e
of 19
e
d.
e
s, end
m
ery
a
inless
e
d
s in
c
rates
g
.
e
mbled
al and
e
an
h
ined
c
cessory

Related product manuals