EasyManua.ls Logo

Flowserve VTP - Page 26

Flowserve VTP
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 26 of
7
See section
4
shaft drivers
leveling det
a
Inst
a
4.5.2
full
y
Li
f
4.5.2.1
See lifting m
E
q
4.5.2.2
in
s
a) Mobile c
entire w
e
b)
Cable sl
i
lifting ey
e
c)
Ordinar
y
wrench
e
wrench
e
cloth.
d)
Thread
s
connecti
Th
vibration is f
r
straightened
and great c
a
A
lways sup
p
lifting or inst
a
inside shippi
individual p
a
Inspect all c
o
parts before
Lifting heav
y
appropriate
t
U
n
4.5.2.3
as
a) Clean th
other fo
r
b) Flush th
e
water.
c) Clean al
l
spots fo
u
emery cl
d) Clean al
l
equipm
e
VERTIC
7
6
4
.4.4 for cou
p
and section
4
ils.
a
llation of p
u
y
assembled
f
tin
g
ethods in se
c
q
uipment an
d
s
tallation of
a
rane capable
e
ight of the p
u
i
ngs for attac
h
e
s.
y
hand tools:
P
e
s, socket set,
e
s, wire brush
,
s
ealing comp
o
on and light
m
e single mos
t
r
om a bent s
h
to stringent
t
a
re must be e
x
p
ort shafting i
n
a
lling.
Parts and
ng container
s
a
ckages.
o
ntainers, cr
a
discarding.
y
objects is d
a
t
ools and pro
c
n
cratin
g
and
s
embled pu
m
e parts of all
d
eign matter.
e
pump insid
e
l
machined s
u
u
nd on the m
a
oth.
l
threaded co
n
e
nt.
A
L TURBIN
E
p
ling installati
o
4
.2.1~4.
2
.4 f
o
u
mps that a
r
c
tion 2.3.
d
tools requ
i
a
full
y
asse
m
of hoisting a
n
u
mp and mot
o
h
ing to the pu
m
P
ipe wrenche
s
screwdriver
s
,
scraper and
o
und designe
d
m
achinery oil.
t
common ca
u
h
aft. Shaftin
g
t
olerances pr
i
x
ercised in it
s
n
at least thr
e
accessories
s
, or attache
d
a
tes and skid
s
a
ngerous. U
s
c
edures is m
u
cleanin
g
of
m
p
d
irt, packing
m
e
and outside
u
rfaces. Re
m
a
chined surfa
c
n
nections an
d
E
PUMPS
(
V
T
o
n on sol
i
d
o
r pump
r
e shipped
i
red for
m
bled pump
n
d lowering t
h
o
r.
m
p and moto
r
s
, end
s
, Allen
fine emery
d
for type of
u
se of pump
g
is
i
or to shippin
g
s
handling.
e
e places wh
e
may be plac
e
d
to skids in
s
for attache
d
s
e of
u
st.
a full
y
m
aterial and
with clean
m
ove any rust
c
es with fine
d
any access
o
T
PS
)
CENTR
I
h
e
r
g
e
n
e
d
d
o
ry
4.5.2.
4
If a ba
s
m (0.0
0
See s
e
Positi
o
found
a
thorou
install
a
Set u
p
center
e
the bo
w
Lower
the cl
a
on a fl
a
and re
d
a) W
h
pu
fa
s
b
o
b) Li
f
us
c) P
o
th
e
th
e
d) If
a
in
c
(l
e
e) If
a
thi
If the
p
proce
d
sectio
n
a) In
s
m
o
fo
u
b) If
s
so
so
c) L
e
re
q
d) C
h
a
n
e) In
s
IFUGAL PU
M
Installin
g
4
s
e plate is us
e
02 in. per ft),
e
ctions 4.2.1
~
o
n lifting equi
p
a
tion opening.
Su
m
ghly cleaned
a
tion.
p
installation
u
ed directly o
v
w
l assembly
the bowl as
s
a
mps or holdi
n
a
t surface.
T
duce possibil
i
hen installing
u
mp assembl
y
s
tened to the
o
wl assembly
f
t the pump to
s
ed, attach it t
o
o
sition pump
o
e
discharge o
f
e
n lower onto
a
stuffing box
c
luded, attac
h
e
ft hand threa
d
a
mechanical
s point per th
e
p
ump include
s
d
ure as listed
n
2.3)
s
tall the sucti
o
o
unting flang
e
u
ndation.
s
oleplate is u
s
o
leplate and
m
o
leplate.
e
vel the solep
q
uired.
h
eck to ensu
r
n
d other forei
g
s
tall the pum
p
M
PS ENGLI
S
g
the full
y
as
e
d, level the
p
grout and an
c
~
4.2.4 for pu
m
p
ment so it wi
l
.
m
p and pipin
g
of all loose
d
u
nit so that th
v
er the well o
r
and suction
b
s
embly into th
n
g device th
a
T
his is to stabi
ity of cross th
152 mm (6 i
n
y
, leave the p
u
wooden skid
is raised to a
o
a vertical po
s
o
the bowl as
o
ver sump or
f the pump w
i
the base. L
e
and a hollow
h
the head sh
a
d
s).
seal is includ
e attached in
s
s
a suction b
a
below. (See
o
n barrel firs
t
e
and bolts d
i
sed, mount
a
m
ount the su
c
p
late & the su
c
r
e suction ba
r
g
n material.
p
.
S
H 7156922
4
flows
e
s
sembled pu
m
p
late to 0.16
m
c
hor in place.
m
p leveling de
t
l
l center over
g
should be
d
ebris before
e lifting cabl
e
r
sump. Car
e
b
arrel with a
c
e well or su
m
a
t is attached
lize bowl ass
e
reading the s
h
n
.) or 203 mm
u
mp securely
(as shipped)
vertical positi
s
ition. If a str
a
sembly.
suction barre
i
th external pi
e
vel the entir
e
shaft driver
a
a
ft to the pu
m
ed, install th
e
s
tructions.
a
rrel (can), f
o
lifting instruc
t
t
and grout th
e
i
rectly to the
a
nd grout the
c
tion barrel o
n
c
tion barrel fl
a
r
rel is free of
d
4
– 02-15
e
rve.com
m
p
m
m per
t
ails.
the
starting
e
will be
e
fully lift
c
lamp.
m
p. Set
to bowls
e
mbly
h
aft.
(8 in.)
until the
on
a
iner is
l. Align
ping
e
pump.
a
re
m
p shaft
e
seal at
o
llow the
t
ions in
e
n
to the
a
nge as
d
ebris

Related product manuals