EasyManua.ls Logo

Flowserve VTP - Page 43

Flowserve VTP
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 43 of
7
T
y
5.7.1.1
the mechani
enough liqui
d
subsequent
A
s
having a tw
o
flanged cou
p
place prior t
o
contact with
shown in se
c
Stu
f
5.7.2
On the initial
packing not
b
must be run
and shorteni
n
The stuffing
b
operation.
T
determined
b
leakage, this
HOT - usuall
adequate.
When adjus
t
down evenly
reduced as
r
VERTIC
7
6
y
pical safet
y
A
fter initi
a
cal seal will
u
d
will remain
startup lubric
s
creen guard
o
-piece head
s
p
ling. This s
c
o
pump start
u
rotating part
s
c
tion 5.7.1.1.
f
fing box adj
starting it is
v
b
e tightened
e
in properly to
n
g of the pac
k
b
ox must be
a
T
he proper a
m
b
y checking t
h
should be c
o
y 40 to 60 dr
o
ing the packi
n
and in small
equired. The
A
L TURBIN
E
g
uards
a
l startup, pr
e
u
sually not b
e
in the seal c
h
ation.
is furnished
w
s
haft or an ad
c
reen must b
e
u
p to prevent
s
. Typical ar
r
ustment
v
ery importan
t
e
xcessively.
N
prevent dam
a
k
ing life.
a
llowed to le
a
m
ount of leaka
h
e temperatu
r
o
ol or just luk
e
o
ps per minut
e
n
g gland, brin
g
steps until th
e
nuts should
o
G
IN
S
E
PUMPS
(
V
T
e
-lubrication
o
required as
h
amber for
w
ith all pump
j
ustable
e
secured in
possible
angement is
t
that the
N
ew packing
a
ge to the sh
a
k for proper
ge can be
r
e of the
e
warm - NOT
e
will be
g
both nuts
e
leakage is
o
nly be
UARDS
S
TALLED
T
PS
)
CENTR
I
o
f
s
a
ft
tighte
n
minut
e
Under
time.
O
be ad
d
After
a
prope
r
box sh
and re
-
5.7.3
Open
l
pump
e
(50 ft)
lubric
a
water
l
disch
a
before
revers
e
when
t
lubric
a
5.7.4
Enclo
s
extran
e
The oi
qualit
y
opera
t
drops/
Injecti
o
Injecti
o
will va
r
0.7 to
0
disch
a
For re
c
lubric
a
see ta
b
oils ar
e
should
oxidati
to 37
c
viscos
i
bearin
g
check
e
requir
e
suppl
y
suppl
y
IFUGAL PU
M
n
ed about on
e
e
intervals to
a
proper oper
a
O
ccasionally
a
d
ed to keep t
h
a
dding two or
t
r
adjustment
c
h
ould be clea
n
-packed.
Open sha
ft
l
ineshaft bea
r
e
d fluid on sh
o
long and us
u
a
tion. All ope
l
evel is more
a
rge head sh
o
e
startup. Th
e
e ratchet on
t
t
urning off pu
a
tion is also n
Enclosed
s
s
ed lineshaft
b
eous liquid (
u
l reservoir m
u
y
of light turbi
n
t
ing temperat
u
minute for e
v
o
n systems a
o
n pressure
a
r
y. Usually 0
0.14 bar (10
t
a
rge pressure
c
ommended
o
a
tion under n
o
b
les 5.2.3.1 a
e
available, oi
d
be obtained.
on inhibitors
a
c
St (mm
2
/
sec
)
i
ty index of 9
0
In t
h
gs, the sourc
e
d against th
e
e
ments for a
n
y
pressure or
y
before pum
p
M
PS ENGLI
S
e
half turn at
a
a
llow the pac
k
a
tion, a packi
n
a new ring of
h
e box full.
t
hree rings o
f
c
annot be ac
h
n
ed completel
f
t lubrication
r
ings are lub
r
o
rt-coupled
u
u
ally do not r
e
n lineshaft p
u
than 15 m (5
o
uld be adeq
u
e
se units sho
u
t
he driver to
p
mp. If there
i
ecessary.
s
haft lubric
a
b
earings are
u
sually oil or
c
u
st be kept fil
n
e oil (about
3
u
re) and adj
u
v
ery 30 m (10
re designed
f
a
nd quantity
o
.45 to 0.90
m
t
o 20 psi) ov
e
of clean liqu
i
o
ils for enclo
s
o
rmal operati
n
nd 5.2.3.2. I
f
i
l with the foll
o
Turbine typ
e
a
dded, visco
s
)
at 40 C (10
0
0
.
h
e case of pr
o
c
e of product
s
e
order. The
r
n
external cle
a
the commen
c
p
startup.
S
H 7156922
4
flows
e
a
time at 20 t
o
k
ing to "run-in
n
g set will last
packing will
n
f
packing, or
w
h
ieved, the st
u
y of all old p
a
before star
t
r
icated by the
u
nits less tha
n
e
quire pre- or
u
mps where t
h
0 ft) below th
u
ately pre-lu
b
u
ld have a n
o
p
revent back
s
i
s no NRR, p
o
a
tion before
s
lubricated by
c
lean water
led with a go
o
3
0 cSt (mm
2
/s
u
sted to feed
3
0 ft) of colum
f
or each inst
a
o
f lubricating
l
m
3
/h (2 to 4 g
p
e
r maximum
p
i
d is required
s
ed lineshaft
b
n
g conditions,
f
none of the
a
o
wing specifi
c
e
oil with rust
s
ity 30 cSt (m
m
0
F) with a
m
o
duc
t
-lubricat
s
upply shoul
d
r
e may be
a
n supply, pa
c
ement of lu
b
4
– 02-15
e
rve.com
o
30
".
a long
n
eed to
w
hen
u
ffing
a
cking
t
up
n
15 m
post-
h
e static
e
b
ricated
o
n-
s
pin
o
s
t
-
s
tart up
an
o
d
s
ec) at
3
n.
a
llation.
l
iquid
p
m) at
p
ump
.
b
earing
please
a
bove
c
ations
and
m
2
/sec)
m
inimum
ed
d
be
rticular
b
rication

Related product manuals