EasyManua.ls Logo

Franke A300 - Setting Up and Preparing the Coffee Machine; Connect the Water Supply

Franke A300
81 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Franke Kaffeemaschinen AG Installation | 6
2 2 x red
>10° dH/>13°e/>18°fH
3 3 x red
>15° dH/>19°e/>27°fH
4 4 x red
>20° dH/>25°e/>36°fH
5 5 x red
>25° dH/>31°e/>45°fH
6.4 Setting up and preparing the coffee machine
1. Check packaging for transport damage. 3. Check that the delivery is complete (see Scope
2. Unpack devices.
of delivery and order).
NOTICE
Overheating damage
If the clearances around and above the machine are too small, heat may accumulate in the machine and lead to
faults.
a) Maintain the prescribed installation dimensions and clearances.
b) Take care to ensure that the clearance spaces are not blocked.
6.5 Connect the water supply
NOTICE
Water damage
If the mains water connection is not implemented correctly, this may result in water damage. The operating company
is responsible for ensuring that the mains water connection is implemented correctly.
a) Take into account the data listed regarding Water connection [ 24].
b) Check that there are no leaks in the mains water connection.

Table of Contents