6 | Installation Franke Kaffeemaschinen AG
30 User manual SB1200
6 INSTALLATION
6.1 Preparations
– The main power connection for the coffee machine must be protected by a residual current circuit-
breaker (RCCB).
– Each terminal of the power supply must be able to be interrupted using a switch.
– The water connection must comply with
Requirements of the water supply [
}
33]
and local and
national rules and regulations.
– The coffee machine must be connected to the water supply with the supplied hose kit. Do not use any
other water hoses that happen to be present.
– Make sure to provide a stable, ergonomic cup tray (min. load capacity 150kg). The operator panel
should be at eye level.
You must have completed these preparations before one of our service technicians can install the coffee
machine for you. Your service technician will install your coffee machine and carry out the initial commis-
sioning process. He will instruct you in the basic functions.
6.2 Dimensions
All dimensions are specified in mm.
More comprehensive specifications are required for setting up the counter furniture. Consult the design
data with regard to this.
NOTICE
Overheating damage
If the clearances around and above the machine are too small, heat may accumulate in the machine and
lead to faults.
a) Maintain the prescribed installation dimensions and clearances.
b) Take care to ensure that the clearance spaces are not blocked.