1 General Information 6
1.1 Notes on Standards 6
1.2 Design Information 7
1.2.1 Approval and obligation to report...................................................................... 7
1.2.2 Requirements for central heating water ............................................................. 7
1.2.3 Ventilation of boiler room ................................................................................ 7
1.2.4 Installing the heating system / Standards .......................................................... 8
Combination with storage tank .........................................................................8
Return feed lift...............................................................................................8
1.2.5 Chimney connection/chimney system ................................................................ 9
Draught limiter...............................................................................................9
Boiler data for constructing the flue gas system:.................................................9
2 Technology 10
2.1 Turbomatic TMC 28-55 dimensions 10
2.2 Components and Connections 11
2.3 Technical specifications 12
Test data for operation with wood chips........................................................... 12
Test data for operation with pellets ................................................................. 13
3 Installation 14
3.1 Transport 14
3.1.1 Positioning................................................................................................... 14
3.1.2 Temporary storage ....................................................................................... 14
3.2 Setting up in the boiler room 14
3.2.1 Removing the boiler from the pallet ................................................................ 14
3.2.2 Moving the boiler in the boiler room ................................................................ 14
3.2.3 Minimum distances in the boiler room.............................................................. 15
3.2.4 General information for boiler room................................................................. 15
3.3 Assembly work 16
3.3.1 Installing the chamber in the boiler ................................................................. 16
3.3.2 Installing the stoker...................................................................................... 19
Installing the burn back flap drive (only with burn back flap) .............................. 20
3.3.3 Installing the induced draught fan................................................................... 21
3.3.4 Installing the WOS Drive ............................................................................... 22
3.3.5 Fitting the automatic heat exchanger ash removal (optional) .............................. 23
Conversion for ashcan on right ....................................................................... 23
Assembly work on boiler................................................................................ 24
3.3.6 Installing the combustion chamber overpressure sensor..................................... 26
3.3.7 Fitting switch cabinet and cable ducts.............................................................. 26
3.4 Electrical connection 28
3.4.1 Laying the cable ........................................................................................... 28
3.5 Connecting the thermal discharge safety device 29
3.5.1 Thermal discharge safety device sensor ........................................................... 29