Contents
1 General 4
1.1 Product overview, TX 5
2 Safety 8
2.1 Hazard levels of warnings 8
2.2 Pictograms used 9
2.3 General safety information 10
2.4 Permitted uses 11
2.4.1 The Clean Air Act 1993 and Smoke Control Areas 11
2.4.2 Permitted fuels 12
Wood chips
12
Wood pellets
12
Changing the fuel
12
2.4.3 Non-permitted fuels 13
2.5 Qualification of operating staff 13
2.6 Protective equipment for operating staff 13
2.7 Design information 14
2.7.1 Installation and approval of the heating system 14
2.7.2 General information for installation room (boiler room) 14
2.7.3 Requirements for central heating water 15
2.7.4 Notes for using pressure maintenance systems 16
2.7.5 Return lift 17
2.7.6 Use with storage tank 18
2.7.7 Chimney connection/chimney system 18
2.8 Safety devices 19
2.9 Residual risks 20
2.10 Emergency procedure 21
2.10.1 Overheating of the system 21
2.10.2 Smell of flue gas 21
2.10.3 Fire in the system 21
3 Operating the System 22
3.1 Assembly and initial startup 22
3.2 Filling/refilling the store with fuel 23
3.2.1 Loading of fuel for a partially emptied store with rotary agitator 23
3.2.2 Loading wood chips in an empty store (not under pressure) 23
3.2.3 Blowing in pellets for a store with pellet screw 24
3.2.4 Blowing in fuel for a partially emptied store with rotary agitator 24
3.2.5 Blowing in fuel for an empty store with rotary agitator 25
3.3 Heating up the boiler 26
3.3.1 Switching on the power supply 26
3.3.2 Switching on the boiler 26
3.3.3 Regulating the boiler 26
3.3.4 Switching off the boiler 26
3.3.5 Switching off the power supply 27
4 Boiler Servicing 28
Contents
2 Froling GesmbH | A-4710 Grieskirchen, Industriestraße 12 | www.froeling.com