12
10 SEAL - CONTROL
Make a seal, peel it apart and examine as follows.
Welding time correct
(seal correct)
Welding time too short
(seal with insufficient tensile strength)
Welding time too long
(possible strap breakage)
11 CLEANING
Clean tension parts from strap abrasion regularly by the use of compressed air (do not use any mechanical
tool for cleaning).
ATTENTION!
When cleaning the tool housing, do not use water or solvents.
12 SERVICE AND REPAIR
Servicing and repair work have to be carried out by authorized service centres only.
If the tool breaks down or does no longer operate do not disassemble it, send it fully assembled to the local
service centre (see name and address on the rear page of this manual). Use original packing.
The electric plastic strapping tool P300 is a high performance tool. We strongly recommend you to have it
serviced by an authorized service shop after 12 months at the latest if used one shift per day. If used two or
more shifts per day the tool has to be serviced after a shorter period of time.
For Parts & Service 1-877-862-6699