9
EN
Installing the Fronius Checkbox
Safety
WARNING!
Operating the equipment incorrectly or poor workmanship can cause serious injury
or damage.
Commissioning of the hybrid system may only be carried out by trained personnel in ac-
cordance with the technical regulations. Read the Installation Instructions and the Operat-
ing Instructions of the Fronius Symo Hybrid and the battery before carrying out any
installation or commissioning work.
WARNING!
An electric shock can be fatal.
Danger due to DC voltage from the inverter and the battery.
► Always make sure the inverter is disconnected and de-energised before carrying out
any connection work.
► Check that the battery is de-energised. The battery should be de-energised when it is
delivered.
► Only an authorised electrical engineer is permitted to connect this equipment to the
public grid.
IP65
2000 m
0 m
> 2000 m
NH
3
Possible assembly positions when using outdoors: