EasyManua.ls Logo

Fujitsu PRIMERGY RX900 S2 - Page 64

Fujitsu PRIMERGY RX900 S2
114 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
64 Operating Manual RX900 S2
Hardware installation
Figure 8: Installing the rail in the rack
Ê Carefully loosen the screws (B) for adjusting the length of the rail and adjust
the length of the rail (1).
Ê Position the outer part of the rail at the left support uprights so that the
screws will be placed as follows:
Rear upper screw: 3rd catch of the 3. HU
Rear lower screw: 1st catch of the 3. HU
Front upper screw: 2nd catch of the 4. HU
Front lower screw: 2nd catch of the 2. HU
Ê Secure the outer part of the rail with four centering screws (2, 3).
Ê Fasten the screws (B) for adjusting the length of the rail.
Ê Repeat the above steps for the right-hand rail with the front and rear right
support uprights.
8. HU
2. HU
5. HU
C
A
C
A
2. H
U
C
C
C
C
C
C
C
C
0. HU
1
/
0

Table of Contents

Other manuals for Fujitsu PRIMERGY RX900 S2

Related product manuals