EasyManua.ls Logo

Fujitsu SPARC Enterprise M3000

Fujitsu SPARC Enterprise M3000
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2 Preparing to Install the Server 2-7
FIGURE 2-2 Power Cables With a Dual-Power Feed Connection
2.2.2.3 Grounding
The SPARC Enterprise M3000 server is shipped with a grounded type (three-wire
type) power cable. Always connect the power cables to grounded power outlets.
Contact the facilities manager or a qualified electrician to determine what type of
power is supplied to your building.
2.2.3 Checking the Installation Location
When installing the server, consider not only the device size but also the sizes of the
required service areas (maintenance areas). For details, refer to the SPARC Enterprise
M3000 Server Site Planning Guide.
PSU#1 PSU#0
CB: Circuit breaker
CB
CB
AC power supply

Table of Contents

Other manuals for Fujitsu SPARC Enterprise M3000

Related product manuals