EasyManua.ls Logo

Furuno DS-80 - DIGITAL INTERFACE STANDARDS; I;O SENTENCE DEFINITIONS

Furuno DS-80
82 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
2.2 Wiring of Distribution Box
The distribution box has two sets of cable clamps, upper for cable DPYCY-1.25/TTYCYS-1
(small hole) and lower for cables TTYCY-2S (medium hole), TTYCY-3S (large hole).
Lay the cables on the clamps as below depending on the terminal board.
TB1: Left side
TB2: Center
TB3: Right side
Cut the cables slack to bind them at the fixing plate with a cable tie, leaving some slack for
future servicing and checking.
All cables except the power cable should be fixed by the clamp with the armor.
Entrance Clamp
Fabrication of DPYCY-1.25/TTYCYS-1
(power cable, contact signal, analog signal, dimmer)
DPYCY-1.25 is a Japan Industrial Standard (JIS) cable. Use the equivalent. DPYCY-1.25 cable
doesn’t have shield.
FV2-M4
Armor
within 350
Anticorrosive
Sheath
Wind the shield.
Vinyl
Sheath
Armor
(Sectional view of DPYCY-1.25)
S =1.25 mm
=1.35 mm
2
Shield
Insulation
Fabrication of cable DPYCY-1.25/TTYCYS-1

Table of Contents

Other manuals for Furuno DS-80

Related product manuals