EasyManua.ls Logo

GBC 16 Series - Starting a Job; Punching and Stacking

GBC 16 Series
132 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2-14 General Procedures
Starting a Job
Punching and Stacking
n
For punching and stacking the 11" edge in the GBC Stacker without a
Bypass installed, follow the procedure below.
n
For punching and stacking the 11" edge in the Xerox High Capacity
Stacker, go to Starting a Job for Bypassing to a Downstream device
(Page 2-20.)
n
For punching and stacking the 8.5" edge, go to Starting a Job for
Bypassing to a Dowstream device (Page 2-20.)
To prepare for starting a printing job and sending it to the FusionPunch II,
perform the following procedures.
1 Set up the FusionPunch II according to the job requirements (For
FusionPunch II setup, refer to the Getting Started section, On-line /
Off-line).
2 From the DocuSP Print Services screen, open the Printer Manager
window and click on the Finishing Icon.
Figure 2-10: The Finishing Window

Related product manuals