2-14 General Procedures
Starting a Job
Punching and Stacking
n
For punching and stacking the 11" edge in the GBC Stacker without a
Bypass installed, follow the procedure below.
n
For punching and stacking the 11" edge in the Xerox High Capacity
Stacker, go to Starting a Job for Bypassing to a Downstream device
(Page 2-20.)
n
For punching and stacking the 8.5" edge, go to Starting a Job for
Bypassing to a Dowstream device (Page 2-20.)
To prepare for starting a printing job and sending it to the FusionPunch II,
perform the following procedures.
1 Set up the FusionPunch II according to the job requirements (For
FusionPunch II setup, refer to the Getting Started section, On-line /
Off-line).
2 From the DocuSP Print Services screen, open the Printer Manager
window and click on the Finishing Icon.
Figure 2-10: The Finishing Window