EasyManua.ls Logo

GE 469

GE 469
336 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5–42 469 MOTOR MANAGEMENT RELAY – INSTRUCTION MANUAL
CHAPTER 5: SETTINGS
Note
Above 8.0 x Pickup, the trip time for 8.0 is used. This prevents the overload curve from
acting as an instantaneous element.
The standard overload curves equation is:
(EQ 5.2)
20.00 1.39 2.78 4.16 5.55 6.94 8.33 9.71 11.10 12.49 13.88 15.27 16.65 18.04 19.43 20.82
Table 5–1: 469 Standard Overload Curve Multipliers
PICKUP
(× FLA)
STANDARD CURVE MULTIPLIERS
× 1 × 2 × 3 × 4 × 5 × 6 × 7 × 8 × 9 × 10 × 11 × 12 × 13 × 14 × 15
Time to Trip
Curve_Multiplier 2.2116623×
0.02530337 Pickup 1()
2
0.05054758 Pickup 1()×+×
----------------------------------------------------------------------------------------------------------------------------------------------=

Table of Contents

Other manuals for GE 469

Related product manuals