EasyManua.ls Logo

GE DigitalFlow XMT868i - Chapter 3. Operation; 3.1 Introduction

GE DigitalFlow XMT868i
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DigitalFlow™ XMT868i Startup Guide 47
Chapter 3. Operation
Chapter 3. Operation
3.1 Introduction
See Chapter 1, Installation, and Chapter 2, Initial Setup, to prepare the Model XMT868i system for operation. When
the meter is ready to take measurements, proceed with this chapter. The following specific topics are discussed:
Powering Up
Using the Display
Taking Measurements
Pausing Measurement
Note: All inputs and outputs of the Model XMT868i are calibrated at the factory, prior to shipment. If it becomes
necessary to recalibrate any of the inputs and/or outputs, see Chapter 1, Calibration, of the Service Manual for
instructions.
WARNING! To ensure the safe operation of the Model XMT868i, it must be installed and operated
as described in this manual. In addition, be sure to follow all applicable local safety codes and
regulations for the installation of electrical equipment.

Table of Contents

Related product manuals