GE HEALTHCARE
DIRECTION 5162630, REVISION 3 LOGIQ™ S6 SERVICE MANUAL
Section 8-3 - Software Loading Procedures (R7.7.x or later with BEP4) 8-5
Section 8-3
Software Loading Procedures (R7.7.x or later with BEP4)
This instructions describe the LOGIQ S6 R7.7.x Application Software installation procedures with BEP4.
8-3-1 General
This procedure describes re-loading of the base system load and application load. This procedure is
NOT intended for upgrades. Follow appropriate manuals for upgrade procedures.
.
8-3-2 Parts Required
Refer to Section 8-2 Software Loading Procedure Guide.
8-3-3 Time Required
Approximately 1 hour
CAUTION
Loading R7.7.x application software procedures requires basically C drives to be ghosted. In
this case, patient image data, preset parameters, and customer data will be kept. However , in
case full ghost will be required, you MUST back up before starting this procedure as follows.
For customer data safe, we recommend you to back up even for the C ghost only.