EasyManua.ls Logo

GE LOGIQ S6

GE LOGIQ S6
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 5162630, REVISION 3 LOGIQ™ S6 SERVICE MANUAL
Section 2-1 - Overview 2-1
Chapter 2
Pre Installation
Section 2-1
Overview
2-1-1 Purpose of this chapter 2
This chapter provides the information required to plan and prepare for the installation of a LOGIQ™ S6.
Included are descriptions of the facility and electrical needs to be met by the purchaser of the unit. A
checklist is also provided at the end of this section to help determine whether the proper planning and
preparation is accomplished before the actual equipment installation is scheduled.
Table 2-8 Contents in Chapter 2
Section Description Page Number
2-1
Overview
2-1
2-2
General Console Requirements
2-2
2-3
Facility Needs
2-7

Table of Contents

Other manuals for GE LOGIQ S6

Related product manuals