DIRECTION 5162630, REVISION 3 LOGIQ™ S6 SERVICE MANUAL
Section 3-4 - Completing the Installation 3-9
Section 3-4
Completing the Installation
3-4-1 Probe (Transducer) Connection
1.) Connect a transducer to the upper transducer receptacle as follows:
a.) Ensure that the transducer twist lock lever to the horizontal position.
b.) Insert the transducer connector on the receptacle guide pin until it touches the receptacle
mating surface.
c.) Twist the transducer twist lock lever to vertical position to lock it in place. Twist the lever to the
horizontal position to disconnect the transducer.
NOTE: It is not necessary to turn OFF power to connect or disconnect a transducer.
2.) Connect the main power cable to a hospital grade power receptacle with the proper rated voltage
checked during pre installation. Never use a three-to-two prong adapter; this defeats the safety
ground.

Table of Contents

Other manuals for GE LOGIQ S6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ S6 and is the answer not in the manual?

GE LOGIQ S6 Specifications

General IconGeneral
BrandGE
ModelLOGIQ S6
CategoryMedical Equipment
LanguageEnglish

Related product manuals