EasyManua.ls Logo

GE LOGIQ S6 - Page 75

GE LOGIQ S6
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION 5162630, REVISION 3 LOGIQ™ S6 SERVICE MANUAL
Section 4-2 - General Procedure 4-3
4-2-2-1 Power Up (cont’d)
4.) Press the ON/OFF
key at the front of the System once.
5.) After initialization is complete, all lighted buttons on the Control Panel light and the default B-Mode
screen or Patient screen (no probes are connected) is displayed on the monitor display.
4-2-2-2 Power Up Sequence
1.) The Start Up Screen will be shown on the Monitor display when the system is turned ON.
4-2-2-3 Entering the Maintenance Mode
Purpose: This is a description on how to enter the maintenance mode.
1.) Insert the service dongle into any USB port.
2.) Wait for scanner boot-up.
3.) Tap ON/OFF the power switch.
Figure 4-12 Power On/Off Standby Switch Location
ON/OFF Switch

Table of Contents

Other manuals for GE LOGIQ S6

Related product manuals