GE  LOGIQ V5/LOGIQ V3
D
IRECTION 5496012-100, REVISION 3BASIC SERVICE MANUAL
10 - 14 Section 10-4 - Tools Required
10-4-11-5 Data Sheet for Transducer Source Leakage Current
The test passes when all readings measure less than the values. Record all data on the PM Inspection 
Certificate.
. 
Equipment damage possibility. Never switch the Polarity and the status of Neutral when the unit 
is powered ON. Be sure to turn the unit power OFF before switching them using the POLARITY 
switch and/or the NEUTRAL switch. Otherwise, the unit may be damaged
Table 10-12 Typical Data Sheet For Transducer Source Leakage Current
Transducer Tested:
 Unit Power
Tester Power Polarity 
Switch
Tester GROUND or 
NEUTRAL Switch Measurement
ON NORM OPEN
ON NORM CLOSED
ON REV OPEN
ON REV CLOSED
OFF NORM OPEN
OFF NORM CLOSED
OFF REV OPEN
OFF REV CLOSED