GE LOGIQ V5/LOGIQ V3
D
IRECTION 5496012-100, REVISION 3BASIC SERVICE MANUAL
1 - 14 Section 1-4 - Lockout/Tagout (LOTO) requirements
Section 1-4
Lockout/Tagout (LOTO) requirements
Follow OSHA Lockout/Tagout requirements (USA) or local Lockout/Tagout requirements by ensuring
you are in total control of the AC power plug at all times during the service process.
To apply Lockout/Tagout:
1.) Plan and prepare for shutdown.
2.) Shutdown the equipment.
3.) Isolate the equipment.
4.) Apply Lockout/Tagout Devices.
5.) Control all stored and residual energy.
6.) Verify isolation.
All potentially hazardous stored or residual energy is relieved.
NOTICE
Energy Control and Power Lockout for LOGIQ V5/LOGIQ V3
WHEN SERVICING PARTS OF THE SYSTEM WHERE THERE IS EXPOSURE TO VOLTAGE
GREATER THAN 30 VOLTS:
1. TURN OFF THE SCANNER.
2. UNPLUG THE SYSTEM.
3. MAINTAIN CONTROL OF THE SYSTEM POWER PLUG.
4. WAIT FOR AT LEAST 20 SECONDS FOR CAPACITORS TO DISCHARGE AS THERE ARE NO
TEST POINTS TO VERIFY ISOLATION. THE AMBER LIGHT ON THE OP PANEL ON/OFF BUTTON
WILL TURN OFF.
Signed
Date
TAG
&
LOCKOUT

Table of Contents

Other manuals for GE LOGIQ V3

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ V3 and is the answer not in the manual?

GE LOGIQ V3 Specifications

General IconGeneral
BrandGE
ModelLOGIQ V3
CategoryMedical Equipment
LanguageEnglish

Related product manuals