EasyManuals Logo

GE MultiLink ML1200 User Manual

GE MultiLink ML1200
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #336 background imageLoading...
Page #336 background image
B–6 MULTILINK ML1200 MANAGED FIELD SWITCH – INSTRUCTION MANUAL
DC POWER INPUT CHAPTER B: DC POWER INPUT
B.5 UL Requirements for DC-powered units
48VDC products shall be installed with a readily accessible disconnect device in the
building installation supply circuit to the product.
1. Minimum 18AWG cable for connection to a Centralized DC power source.
2. Minimum 14AWG cable for connection to a earth wiring.
3. Use only with Listed 10 A circuit breaker provided in building installation.
4. “Complies with FDA radiation performance standards, 21 CFR subchapter J.”
or equivalent.
5. Fastening torque of the lugs on the terminal block: 9 inch-pound max.
6. To secure a centralized DC Power Source cable , use at least four cable ties to
secure the cable to the rack at least 4 inches apart, with the first one located
within 6 inches of the terminal block.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE MultiLink ML1200 and is the answer not in the manual?

GE MultiLink ML1200 Specifications

General IconGeneral
BrandGE
ModelMultiLink ML1200
CategorySwitch
LanguageEnglish

Related product manuals